You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Sodetan di Pulau Untung Jawa Rampung

Sodetan Construction on Untung Jawa Island Completed

Sodetan is connected to the absorption well that is on the main road

The a crossing channel or locally known as sodetan construction in SDN 02 area, Untung Jawa Island, Thousand Islands, finally completed, on Saturday (3/28).

"Sodetan is connected to the absorption well that is on the main road," expressed Thousand Islands Water Resources Sub-agency Head, Abdul Rauf, Sunday (3/29).

Cilincing People Affected by Sodetan Work Relocated to Marunda Flats

Untung Jawa Island Urban Village Head Supriyadi said it was made to anticipate flood when it rains.

"Hopefully it can optimally minimize flood during rainy season, as its location is a basin," he stated.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2378 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1027 personAldi Geri Lumban Tobing
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye986 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye855 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye746 personBudhi Firmansyah Surapati