You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Sodetan di Pulau Untung Jawa Rampung
.
photo Suparni - Beritajakarta.id

Sodetan Construction on Untung Jawa Island Completed

Sodetan is connected to the absorption well that is on the main road

The a crossing channel or locally known as sodetan construction in SDN 02 area, Untung Jawa Island, Thousand Islands, finally completed, on Saturday (3/28).

"Sodetan is connected to the absorption well that is on the main road," expressed Thousand Islands Water Resources Sub-agency Head, Abdul Rauf, Sunday (3/29).

Cilincing People Affected by Sodetan Work Relocated to Marunda Flats

Untung Jawa Island Urban Village Head Supriyadi said it was made to anticipate flood when it rains.

"Hopefully it can optimally minimize flood during rainy season, as its location is a basin," he stated.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye681 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye599 personFolmer
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye437 personAldi Geri Lumban Tobing
  4. Odd-Even Policy in Jakarta Put on Hold for Eid Break

    access_time28-03-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye271 personBudhi Firmansyah Surapati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik